The Ibn Battuta Gate complex is a mixed use development whose iconic arch entrance greets visitors as they approach.

Envac designed, built and now operates and maintains one system that collects mixed waste from the 396 room Mövenpick Hotel.

Over the last 6 years solid waste has been collected via two inlets and 250 meters of pipeline strategically located within the hotel building. The Envac system efficiently and hygienically removes solid waste and consolidates it at the onsite collection station. The collection container is collected once a week, an 80% reduction when compared to conventional waste collection practices.

Basic project information
CountryUAE
CityDubai
Project startup2009
System in operation2010
Basic system data
Type of systemStationary Vacuum System
System subtypeSVS 400
Application areaHotel
Final capacity per day20 tons per day
Area size37,000m2
Number of fractions1
Number of inlets2
Total metres of pipe250
Type of wasteGeneral waste / Rest